Industries
Laboratory building Erlangen
Fire-resistant separation of fire loads of various types (electrical distribution units, gas cylinders)
PRIODOOR ETX; PRIOWALL
Siemens Headquarters
Closure of outflow chutes of RDA, smoke control of safety staircases
PRIODOOR ETX RDA
Sortimo international
Fire load insulation of installation shafts and stored goods on the escape and rescue route
PRIOWALL; PRIODOOR ETX
Smoke extraction from escape routes
Outflow closure for smoke extraction shafts in escape routes of an administration building
PRIODOOR ETX RDA
Partitioning of shafts
Fire-resistant partitioning of installation shafts, electrical distributors and ventilation systems in a hall
Separation of fire loads
Fire load partitioning of electrical distributor and storage room to the necessary escape route in an industrial building
Wacker Chemie AG Burghausen
Fire load insulation of installation shafts and storage goods on the escape and rescue route